Haywood Jackson Case Study Revitalising The Railway 750x500 1
NEWS

REVITALISING THE RAILWAY: A CASE STUDY ON THE REFURBISHMENT AND TRANSFORMATION OF LIFE EXPIRED LINESIDE BUILDINGS.

Haywood Jackson Case Study Revitalising The Railway 750x500 1

Principal Supply Points (PSP’s) and Uninterruptible Power Supplies (UPS’s) are both pieces of critical rail infrastructure required to maintain the rail service. These steel container type structures house high voltage electrical and signalling equipment, however a large majority of these lineside buildings on the network have come to the end of their serviceable lives.

Please enable JavaScript in your browser to complete this form.

LET’S TALK

Ready to discuss your next project? Contact us today to learn more about our services and how we can help bring your vision to life. Whether you need structural steel fabrication, GRP manufacturing, or any other specialised solution, Haywood & Jackson is your trusted partner for success.